 |
Motel-Restaurant-Yachting Club LOSSIVAHTI Korpilahti, Finland |
 |
|  |
 |


The bridge building project was completed in 1997 with a total cost of FIM 120 million ( 20 mill USD) |
 |
Some advanced technologies were used in building the bridge. The structure supported itself while being built. An international European Alpine bridge building designer team was used in consulting the project. |
 |
|
|  |
Many think that a beautiful scenery like ours need no better frame to support the visual than this winning bridge design named by the architects as "the Wing" |
 |
|
|
|
|